- Acceptance Testing:
- Initial Test: Conducted when the pump is first installed to verify it meets design specifications.
- Comprehensive: Includes flow tests, pressure tests, and system integration checks.
- Maintenance Testing:
- Regular Basis: Conducted periodically to ensure the pump continues to meet performance standards.
- Focused: Often involves specific tests like the churn test and flow tests at rated conditions.
What are the key differences between fire pump testing for acceptance and maintenance purposes?