How to install XBD electric fire pump?

2023-03-28

The first step is to check the condition of the water pump. Guarantee that the XBD fire pump is intact, the structure is complete, the seal is good, and the test results meet the design standards. Check the equipment before installation to avoid problems with the pump body during subsequent use and delay rescue time.

The second step is to select a site. The installation location of the fire pump should be as close to the water source as possible. If there are natural water bodies such as lakes or rivers, it should be as close to the river and lake as possible. If not, it should be as close to the water pipeline as possible. This is to reduce the number of subsequent pipelines The length of laying, on the other hand, is also for the convenience of water supply.

The third step is to install the pump body and the base. There are two different installation methods here. One is the more traditional direct rigid connection using cement, and the other is flexible connection using new materials. These two have a certain influence on the stability of the subsequent pump body, so try to choose the second installation method for connection.

The fourth step is to install the pipeline. Before installing the XBD fire pump pipeline, it is necessary to support the inlet and outlet pipes. This is to avoid the pressure of the entire inlet and outlet pipes from being concentrated on the pump body, which will have a greater impact on the pump body. After the support is completed, it can be Connect the pipes. In this process, it should be noted that the entire pipeline should be as straight as possible to avoid bending. At the same time, extra attention should be paid to the sealing of the interface to prevent water leakage.

The fifth step is to adjust the test. After the above steps are completed, the basic installation of the entire pump body is completed, but it needs to be adjusted and tested later, such as adjusting the pressure state and testing its specific effects.

The above are the installation steps of the XBD fire pump. During the installation process, it is necessary to pay attention to the installation of the base and the installation of the pipeline. These two parts must be installed tightly first, and then ensure the stability and the sealing of the interface as much as possible.